Clifton Ridge Terminal Fire Protection Improvements
![](https://cdn.prod.website-files.com/63eabf3b30bcdedd0d019895/63eac093b0207532be05bd8d_63723488c22b25d292a949f1_clifton-ridge-terminal-fire-protection-improvements-003.jpeg)
Owner
Citgo Petroleum Corporation
Engineer
Arcadis
Date of Completion
April 1, 2020
General Contractor
Benton's Equipment and Construction
![](https://cdn.prod.website-files.com/63eabf3b30bcdedd0d019895/63eac093b020755f6105bd90_637234940cdf4feb65b5aee8_clifton-ridge-terminal-fire-protection-improvements-010.jpeg)
![](https://cdn.prod.website-files.com/63eabf3b30bcdedd0d019895/63eac093b0207530f105bd91_637234944935694a1fb4bcc0_clifton-ridge-terminal-fire-protection-improvements-009.jpeg)
![](https://cdn.prod.website-files.com/63eabf3b30bcdedd0d019895/63eac093b0207548f405bd92_637234940e1e229f55623882_clifton-ridge-terminal-fire-protection-improvements-008.jpeg)
![](https://cdn.prod.website-files.com/63eabf3b30bcdedd0d019895/63eac093b020754f7405bd8f_63723494493569353eb4bcbf_clifton-ridge-terminal-fire-protection-improvements-007.jpeg)
![](https://cdn.prod.website-files.com/63eabf3b30bcdedd0d019895/63eac093b02075760805bd8e_63723494decbdf878b374f8c_clifton-ridge-terminal-fire-protection-improvements-006.jpeg)
![](https://cdn.prod.website-files.com/63eabf3b30bcdedd0d019895/63eac093b02075d76f05bd93_63723494654c1063270bb326_clifton-ridge-terminal-fire-protection-improvements-005.jpeg)
![](https://cdn.prod.website-files.com/63eabf3b30bcdedd0d019895/63eac093b020754c3205bd94_6372349497d1a7694034eb23_clifton-ridge-terminal-fire-protection-improvements-004.jpeg)
![](https://cdn.prod.website-files.com/63eabf3b30bcdedd0d019895/63eac093b020753ab705bd95_637220ec0202abeaeee1e0f8_structural-concrete-002.png)
No items found.
Project Overview
Subcontracted by Benton’s Equipment and Construction, Sealevel self-performed the foundation work for a fire protection improvement project. Collectively, the project called for a total of 220 cubic yards of concrete and 17 tons of rebar. The project was completed ahead of schedule, under budget and with zero-lost time incidents.
Other specs of the project included:
- 110’ x 30’ cofferdam
- 16′ x 7′ x 18’ drafting pit
- (2) 12” x 45’ pipe piles
- flared headwall
- 50’ x 6’ of retaining wall
- (4) guard post bollards
- 2,200 square feet of concrete paving
- 130 linear feet of curb
- 20’ x 45’ x 8” boat ramp